Running Projects
Atyabul Masajid:
Total Estimated Cost | |
Total construction area | 44100.00 sq |
Elevation Images | |
Darul Uloom Waqf Deoband has started constructing a grand Jami Masjid which is tobe completed very soon insha-Allah. It has the capacity of 10,000 Musallees.
Washroom Block
Total Estimated
Total Estimated Cost | Rs. 33,28000.00 |
Elevation Images | ![]() |
There are around three thousand students receiving Islamic Education. A washroom block was newly constructed near the students hostel. Now another washroom block near the Atyabul Masajid is underway.
![]() |
Extension & Renovation of Old Hostel
Total Estimated Cost | Rs. 20,00000.00 |
The renovation of existing hostel is in progress.
Boundary Wall
Total Estimated Cost
Rs. 10,00000.00
The existing boundary walls are at very low height. construction is going on to raise the level of the boundary walls.
Donation in kind
You can be of help by offering:
- Brick, cement, rod and other construction materials
- Fans and other electric stuff for Masjid, classes, hostel
- Wheat, pulse and other food materials for students
- Skins of slaughtered animals at the time of Eid-ulAzha
- Computers
- Clothes for poor students
-----
Postal Address:
Mohtamim
Darul Uloom Waqf Deoband 247554,
Distt. Saharanpur, UP, India
Contact Us at:
Phone VC Off. +91-1336-222752
Fax: +91-1336-222752
Email Us:
Rector
This email address is being protected from spambots. You need JavaScript enabled to view it.
Darul Uloom Waqf Deoband
This email address is being protected from spambots. You need JavaScript enabled to view it.